Completed August 2010

After a year of construction, the addition and renovations to Glenridge Elementary School are complete. The improvements to the facility were possible thanks to the Clayton community's support of Proposition S in April 2009.

Explore this page to learn about the Prop S Glenridge projects. Watch a short video, view photos that document the construction progress and get the details about the improvements.

GLN
Architectural Rendering
GLN_final
Completed Construction




Glenridge Elementary School Principal Beth Scott gives an
inside tour of the
newly-renovated building.

Glenridge Projects Funded Through Prop S

  • New science lab provides dedicated space for science specialists and to support increased focus on K-5 science
  • Compact, three-story addition moves classroom and science lab into new addition and converts old space into flexible, small-group learning space, which allows programs such as EL, OT, PT and learning support to move out of the hallways and vestibules and into more appropriate spaces
  • Basement of addition serves as expanded cafeteria and provides flexible space to better accommodate large group activities
  • Fifth-grade classrooms reconfigured to provide more space
  • Improvements to the gymnasium replace antiquated lighting, update finishes and repair damaged floor
  • Counselor’s office expanded and relocated to better support students and their families and provide space that is on-par with other elementary schools
  • Teacher work room renovated
  • New entry plaza and relocated bus drop off near kindergarten entry
  • Additional parking and reconfigured lot improve traffic circulation
  • Expanded storage added to address storage needs
  • Grass area of playfield re-graded to improve drainage
  • Additional power and data wiring increases capacity in all classrooms
  • HVAC equipment updated and replaced to improve indoor air quality and increase energy efficiency
  • Fire sprinklers installed throughout building
  • New electrical service entrance gear replaces existing, leaky gear
Check out the photo galleries below to watch the construction process unfold.

August 6, 2010


July 2, 2010


June 25, 2010



May 27, 2010