Captain Elementary School

Completed August 2010

After a year of construction, the addition and renovations to Captain Elementary School are complete. The improvements to the facility were possible thanks to the Clayton community's support of Proposition S in April 2009.

Explore this page to learn about the Prop S Captain projects. Watch a short video, view photos that document the construction progress and get the details about the improvements.

CPT
Architectural Rendering
CPT_Final
Completed Construction




Captain Elementary School Principal Sean Doherty gives an inside
tour of the
newly-renovated building.

Captain Projects Funded Through Prop S

  • New science lab provides dedicated space for science specialists and supports increased focus on K-5 science
  • Counselor’s office relocated and nurse’s office expanded, both to better support students and their families
  • Flexible, small-group learning space gained to get programs such as EL, OT, PT and learning support out of the hallways/vestibules and into more appropriate spaces
  • New hallway/entry vestibule provides direct access from west playground to school (and restrooms) while eliminating safety hazard of traveling along Northwood to go to and from school/restroom
  • Gym restrooms renovated to allow access from new hallway/science and Spanish area
  • New corridor eliminates the need to cross the gym to get to the Spanish room
  • Taller lockers throughout the second floor screen classrooms from the noise and visual distractions of the busy walkways
  • Additional parking at the west end of the playground provides needed spaces
  • New ADA ramps and stairs increase accessibility from sidewalk to the new entry and from the new entry down to the playground
  • Additional storage added in a mezzanine level under current fifth grade floor
  • Additional power and data wiring increases capacity in all classrooms
  • HVAC equipment updated and replaced to improve indoor air quality and increase energy efficiency
  • New electrical service entrance gear replaces existing, outdated gear
  • Fire sprinklers installed throughout building
Check out the photo galleries below to watch the construction process unfold.

August 6, 2010


July 2, 2010


June 25, 2010



May 27, 2010